Day 3 of construction. Thankful for everything coming together as planned. With an excellent day of work the day prior, we moved on to finalizing the coop and small jobs. The water was connected to the waterers (almost — needed a few elbows). The doors were made with good locks so we could actually leave some tools rather than hauling up and down the mountain. The huge layer box was build (great job Terry and Pete). The electricity was run (thanks Roger) and mostly works with 2 inches of wire to spare. One more day to finalize after a brief hardware store run and we will be ready for chickens. Thankfully, with little to do tomorrow — we will sleep in and start at 10am.

By: Bryan Myers

Bryan and Mike framing up the door to the feed room.

Bryan and Mike framing up the door to the feed room.

Jermaine the plumber.

Jermaine the plumber.

Roger the electrician.

Roger the electrician.

Huge layer box (weighs as much as it looks).

Huge layer box (weighs as much as it looks).

With enough zinc, the roof is done!

With enough zinc, the roof is done!

Getting there.

Getting there.

Work space in feed room.

Work space in feed room.

Doors done to keep the 2-legged rats out.

Doors done to keep the 2-legged rats out.

Looking like an actual chicken coop.

 

One tarp short!

One tarp short!

 

 

 

 

 

 

 


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Categories

%d bloggers like this: